Naaman, Author at AKA Contracting https://aka-contracting.com/ar/author/naaman/ نبني المستقبل معاً الحلول الامثل للهياكل الفولاذية. Tue, 31 Mar 2026 08:03:37 +0000 ar hourly 1 https://wordpress.org/?v=6.9.4 https://aka-contracting.com/wp-content/uploads/2024/04/cropped-aka-logo-01-32x32.png Naaman, Author at AKA Contracting https://aka-contracting.com/ar/author/naaman/ 32 32 Logistics Warehouse Projects in Saudi Arabia https://aka-contracting.com/ar/logistics-warehouse-projects-in-saudi-arabia/ https://aka-contracting.com/ar/logistics-warehouse-projects-in-saudi-arabia/#respond Thu, 26 Mar 2026 13:47:47 +0000 https://aka-contracting.com/?p=10476 Logistics Warehouse Projects in Saudi Arabia Logistics warehouse projects play a critical role in supporting modern supply chains, especially in fast-growing markets like Saudi Arabia. As industries expand and demand for efficient distribution increases, the need for high-performance logistics facilities has become more important than ever. A successful logistics warehouse project goes beyond construction. It requires a deep understanding of operational workflows, storage optimization, and long-term scalability. From truck circulation and loading dock positioning to internal movement and safety planning, every detail directly impacts efficiency and cost. Real Logistics Warehouse Projects by AKA Contracting Our experience includes delivering multiple logistics warehouse projects across Saudi Arabia. We completed several facilities for SMSA Express, including multi-site logistics warehouses built using pre-engineered steel structures. These projects combined speed of execution with high structural performance, enabling rapid operational readiness. SMSA – Tabuk SMSA – Hail & Medina SMSA – Dammam The Omar Qasim Logistics Warehouses project reflects our ability to deliver facilities tailored to specific distribution requirements, with a focus on efficient layout planning and long-term durability. In addition, we delivered a logistics warehouse facility for the Saudi Foam Plates Manufacturing Company, where the project included steel structure works, MEP systems, and external infrastructure such as asphalt works to support seamless truck movement and site accessibility. Integration: The Key to Successful Warehouse Projects What sets successful logistics warehouse projects apart is the integration of all systems into one cohesive solution. Structural design, flooring performance, electrical systems, and safety measures must work together to ensure long-term reliability. A warehouse that is not properly integrated may face operational inefficiencies, increased maintenance costs, and safety risks. That is why coordination between all disciplines is essential from the early design stages. Choosing the Right Partner for Your Project Choosing the right contractor for logistics warehouse projects means selecting a partner who understands both construction and operations. At AKA Contracting, we deliver facilities that are not only built to last but also engineered to perform efficiently in real-world conditions. If you are planning your next logistics warehouse project in Saudi Arabia, contact us today to discuss your project requirements and develop a solution tailored to your operational goals.

The post Logistics Warehouse Projects in Saudi Arabia appeared first on AKA Contracting.

]]>

مشاريع المستودعات اللوجستية في المملكة العربية السعودية

logistics warehouse projects - Saudi Foam Manufacturing - AKA Contracting

تُعدّ مشاريع المستودعات اللوجستية عنصراً بالغ الأهمية في دعم سلاسل التوريد الحديثة، لا سيما في الأسواق سريعة النمو كالمملكة العربية السعودية. ومع توسع الصناعات وازدياد الطلب على التوزيع الفعال، باتت الحاجة إلى مرافق لوجستية عالية الأداء أكثر أهمية من أي وقت مضى.

إن نجاح مشروع مستودع لوجستي لا يقتصر على مجرد الإنشاء، بل يتطلب فهمًا عميقًا لسير العمليات التشغيلية، وتحسين التخزين، وقابلية التوسع على المدى الطويل. فمن حركة الشاحنات وتحديد مواقع أرصفة التحميل إلى التخطيط الداخلي للحركة والسلامة، يؤثر كل تفصيل بشكل مباشر على الكفاءة والتكلفة.

مشاريع مستودعات لوجستية من تنفيذنا

تشمل خبرتنا تنفيذ العديد من مشاريع مستودعات الخدمات اللوجستية في جميع أنحاء المملكة العربية السعودية.

أنجزنا العديد من المرافق لشركة سمسا اكسبرس، بما في ذلك مستودعات لوجستية متعددة المواقع تم بناؤها باستخدام هياكل فولاذية مسبقة الصنع. جمعت هذه المشاريع بين سرعة التنفيذ والأداء الهيكلي العالي، مما أتاح جاهزية تشغيلية سريعة.

يعكس مشروع مستودعات عمر قاسم اللوجستية ، قدرتنا على توفير مرافق مصممة خصيصًا لتلبية متطلبات التوزيع المحددة، مع التركيز على التخطيط الفعال والتصميم طويل الأمد.

يعكس مشروع مستودعات الشركة السعودية لصناعة أطباق الفوم، حيث تضمن المشروع أعمال الهياكل الفولاذية وأنظمة MEP والبنية التحتية الخارجية مثل أعمال الأسفلت لدعم حركة الشاحنات السلسة وإمكانية الوصول إلى الموقع.

التكامل: مفتاح نجاح مشاريع المستودعات

ما يميز مشاريع مستودعات الخدمات اللوجستية الناجحة هو دمج جميع الأنظمة في حل متكامل. يجب أن يعمل التصميم الهيكلي، وأداء الأرضيات، والأنظمة الكهربائية، وإجراءات السلامة معًا لضمان موثوقية طويلة الأمد.

فقد يواجه المستودع غير المتكامل بشكل صحيح قصور تشغيلية، وزيادة في تكاليف الصيانة، ومخاطر تتعلق بالسلامة. ولذلك، يُعد التنسيق بين جميع التخصصات أمراً بالغ الأهمية منذ المراحل الأولى للتصميم.

اختيار الشريك المناسب لمشروعك

إن اختيار المقاول المناسب لمشاريع مستودعات الخدمات اللوجستية يعني اختيار شريك يفهم كلاً من الإنشاء والتشغيل. في AKA Contracting، نقدم مرافق لا تقتصر على كونها مبنية لتدوم طويلاً فحسب، بل مصممة أيضاً لتعمل بكفاءة عالية في ظروف التشغيل الفعلية.

إذا كنت تخطط لمشروع مستودع لوجستي جديد في المملكة العربية السعودية، تواصل معنا. اليوم لمناقشة متطلبات مشروعك وتطوير حل مصمم خصيصًا لأهدافك التشغيلية.

The post Logistics Warehouse Projects in Saudi Arabia appeared first on AKA Contracting.

]]>
https://aka-contracting.com/ar/logistics-warehouse-projects-in-saudi-arabia/feed/ 0
Logistics Warehouse Contractor: How AKA Contracting Delivers Efficient, Safe, and Scalable Warehouse Facilities https://aka-contracting.com/ar/logistics-warehouse-contractor/ Wed, 11 Feb 2026 10:26:55 +0000 https://aka-contracting.com/?p=10444 Logistics Warehouse Contractor: How AKA Contracting Delivers Efficient, Safe, and Scalable Warehouse Facilities   When you’re planning a new distribution hub or upgrading an existing facility, choosing the right logistics warehouse contractor is one of the most important decisions you’ll make. A logistics warehouse is not just a big box: it’s a high-performance environment where layout, safety, durability, and speed of operations directly impact your daily costs and customer satisfaction. At AKA Contracting, we build and upgrade logistics warehouses with a clear focus on operational efficiency, compliance, and long-term value. From civil works and structural solutions to fit-out and site coordination, our team supports projects where timelines are tight and performance standards are non-negotiable. What to expect from a Logistics Warehouse Contractor A specialized logistics warehouse contractor should understand how warehouse design impacts real-world workflows. That includes: Optimized internal circulation: dock positioning, loading bay access and safe pedestrian separation Floor performance: high-load concrete floors, flatness requirements, abrasion resistance, and joint detailing MEP readiness: power distribution for equipment, lighting levels, ventilation, fire protection, and future scalability Safety and compliance: clear HSE procedures, clean site operations, and strong quality control processes AKA Contracting experience in logistics facilities We have executed multiple logistics and warehouse facilities in Saudi Arabia, with scopes that combine structure, MEP systems, and functional finishes. For example, we completed a 6,700 m² logistics warehouse project for SMSA Express Transport Company in just 7 months, including a main warehouse and mezzanine offices, integrating pre-engineered steel structures with civil, electrical, and mechanical systems plus architectural finishes. In Riyadh’s Bawaba Industrial City, we delivered a 3,000 m² turnkey logistics warehouse for Saudi Foam Plates Manufacturing Company within a tight 5-month timeline, incorporating steel structure works, electrical and HVAC systems, fire protection and surveillance networks, and 2,000 m² of asphalt works to support smooth site accessibility and internal movement. If you’re looking for a logistics warehouse contractor who can deliver quality execution, HSE-driven site management, and reliable timelines, we are ready to build your next warehouse project. Contact us.  

The post Logistics Warehouse Contractor: How AKA Contracting Delivers Efficient, Safe, and Scalable Warehouse Facilities appeared first on AKA Contracting.

]]>

مقاول مستودعات الخدمات اللوجستية: كيف توفر شركة AKA Contracting مرافق لوجستية فعالة وآمنة وقابلة للتوسع

smsa express transport company logitsics warehouses contractor aka contracting

 

عند التخطيط لإنشاء مركز توزيع جديد أو تطوير منشأة قائمة، فإن اختيار مقاول مستودعات لوجستية مناسب يُعدّ من أهم القرارات المؤثرة في نجاح المشروع. فالمستودع اللوجستي ليس مجرد مساحة تخزين كبيرة، بل بيئة تشغيل عالية الأداء يؤثر تصميمها وسلامتها وجودة تنفيذها بشكل مباشر على تكاليف التشغيل اليومية ومستوى رضا العملاء.

في AKA Contracting ننفّذ مشاريع المستودعات اللوجستية وفق رؤية ترتكز على الكفاءة التشغيلية، والالتزام بالمعايير، وتحقيق قيمة طويلة الأمد. نُدير المشروع من الأعمال المدنية والإنشائية، مرورًا بالحلول الهيكلية وأنظمة الأعمال الكهروميكانيكية، وصولًا إلى التشطيبات والتنسيق الموقعي، خاصة في المشاريع التي تتطلب جداول زمنية دقيقة.

ماذا يجب أن تتوقع من مقاول مستودعات لوجستية؟

المقاول المتخصص يدرك أن تصميم المستودع ينعكس مباشرة على حركة العمل اليومية داخله، ولذلك يراعي ما يلي:

  1. تحسين الحركة الداخلية: توزيع منصات التحميل، تنظيم مسارات الشاحنات والرافعات، وضمان فصل آمن بين حركة المعدات والمشاة.

  2. أداء الأرضيات: تنفيذ أرضيات خرسانية تتحمّل الأحمال العالية، مع مراعاة الاستواء، ومقاومة التآكل، ومعالجة الفواصل لضمان استدامة الأداء.

  3. توزيع الطاقة للمعدات (MEP): جاهزية الأنظمة الكهروميكانيكية مستويات الإضاءة المناسبة، التهوية، أنظمة مكافحة الحريق، وقابلية التوسّع المستقبلي.

  4. السلامة والامتثال: تطبيق إجراءات صارمة للصحة والسلامة المهنية، وإدارة موقع نظيفة، وأنظمة رقابة جودة دقيقة في جميع المراحل.


خبرتنا في مشاريع المستودعات اللوجستية

نفّذنا في المملكة عددًا من مشاريع المستودعات اللوجستية التي جمعت بين الهيكل الإنشائي، وأنظمة MEP، والتشطيبات الوظيفية المتكاملة.

منها مشروع مستودعات شركة سمسا اكسبريس بمساحة 6,700 م²، الذي أُنجز خلال 7 أشهر فقط، متضمّنًا مستودعًا رئيسيًا ومكاتب ميزانين، مع دمج الهياكل الفولاذية المسبقة الصنع بالأعمال المدنية والكهربائية والميكانيكية والتشطيبات المعمارية.

كما سلّمنا في مدينة البوابة الصناعية بالرياض مستودعًا لوجستيًا متكاملًا بمساحة 3,000 م² لصالح الشركة السعودية لصناعة أطباق الفوم خلال 5 أشهر، شمل أعمال الهيكل الفولاذي، الأنظمة الكهربائية وأنظمة التكييف، منظومات الحماية والمراقبة، إضافة إلى أعمال أسفلت بمساحة 2,000 م² لضمان سهولة الحركة داخل الموقع.


إذا كنت تبحث عن مقاول مستودعات لوجستية يقدّم تنفيذًا عالي الجودة، وإدارة موقع قائمة على السلامة، والتزامًا دقيقًا بالجداول الزمنية، فنحن مستعدون لتنفيذ مشروعك القادم بكفاءة واحترافية.

تواصل معنا.

 

The post Logistics Warehouse Contractor: How AKA Contracting Delivers Efficient, Safe, and Scalable Warehouse Facilities appeared first on AKA Contracting.

]]>
Almarai New Central Laboratory Project Is Launched https://aka-contracting.com/ar/launching-construction-works-on-the-new-central-laboratory-project-for-almarai-company/ https://aka-contracting.com/ar/launching-construction-works-on-the-new-central-laboratory-project-for-almarai-company/#respond Tue, 10 Feb 2026 10:29:24 +0000 https://aka-contracting.com/?p=10453 AKA Contracting takes a major step in its digital transformation by adopting Odoo ERP, unifying all operations under one smart, integrated platform.

The post Almarai New Central Laboratory Project Is Launched appeared first on AKA Contracting.

]]>

انطلاق الأعمال التنفيذية في مشروع المختبر المركزي الجديد لشركة المراعي

انطلقت الأعمال الميدانية في مشروع المختبر المركزي الجديد لشركة المراعي. يشكّل هذا المشروع امتدادًا طبيعيًا لمسار بُني على الخبرة وتحمل المسؤولية. نمضي في تنفيذه برؤية واضحة، حيث تُوظَّف القدرات في مشاريع تُحدث فرقًا حقيقيًا وتترك أثرًا طويل الأمد.

The post Almarai New Central Laboratory Project Is Launched appeared first on AKA Contracting.

]]>
https://aka-contracting.com/ar/launching-construction-works-on-the-new-central-laboratory-project-for-almarai-company/feed/ 0
Steel Structure Projects by AKA Contracting https://aka-contracting.com/ar/steel-structure-projects-by-aka-contracting/ https://aka-contracting.com/ar/steel-structure-projects-by-aka-contracting/#respond Thu, 05 Feb 2026 09:24:00 +0000 https://aka-contracting.com/?p=10441 The Backbone of Modern Construction Across Saudi Arabia, Steel Structure Projects are reshaping the industrial and commercial landscape. Known for their durability, flexibility, and cost efficiency, steel buildings have become the preferred choice for factories, logistics warehouses, and administrative facilities. At AKA Contracting, we specialize in designing and constructing turnkey steel projects that meet the highest standards of safety and performance. Why Steel Structure Projects Lead the Way Steel structures offer exceptional strength while allowing faster project delivery and lower maintenance costs. Their modular nature supports expansion and adaptation: essential features for today’s dynamic industries.From concept to completion, AKA Contracting manages every stage with precision: structural design, fabrication, erection, and finishing. Our projects not only meet technical requirements but also reflect architectural harmony and long-term reliability. Showcasing Excellence Across the Kingdom Over the years, AKA has completed numerous Steel Structure Projects across key industrial cities in Saudi Arabia, including Riyadh, Jeddah, Hail, Medina, Dammam & Abha.Key projects examples include: Saudi Foam Plate Manufacturing Factory: a 12,000 m² steel structure industrial complex. Bahri Logistics Cold Storage Facility: a 15,000 m² dry warehouse, transformed into a high-performance, climate-controlled warehouse. SMSA Express Warehouses: multi-site turnkey logistics facilities built with prefabricated steel systems. Each project demonstrates AKA’s ability to deliver large-scale, integrated solutions that balance structural strength, functionality, and speed of execution. →Explore more of our completed projects. Steel Structure Projects for Every Sector Whether industrial plants, logistics hubs, or commercial developments, our expertise ensures each structure performs efficiently under demanding conditions. We integrate advanced engineering, MEP systems, and architectural finishes within a single cohesive turnkey framework: saving time, reducing risk, and maximizing value for our clients. Partner with a Trusted Steel Structure Contractor in KSA With a proven track record of excellence, AKA Contracting continues to set new benchmarks for Steel Structure Projects in Saudi Arabia.If you’re planning to build your next industrial or commercial facility, let’s talk about how we can bring your vision to life.Contact us today.

The post Steel Structure Projects by AKA Contracting appeared first on AKA Contracting.

]]>
الهياكل الفولاذية: الخيار الأذكى في البناء الحديث

في مختلف أنحاء المملكة العربية السعودية، تُعيد مشاريع الهياكل الفولاذية تشكيل ملامح البناء الصناعي والتجاري. وبفضل ما تتميز به من متانة عالية، ومرونة تصميمية، وكفاءة اقتصادية، أصبحت الهياكل الفولاذية الخيار المفضل للمصانع، والمستودعات اللوجستية، والمباني الإدارية الحديثة. في شركة AKA Contracting، نختص بتصميم وتنفيذ مشاريع فولاذية متكاملة بنظام تسليم مفتاح، تُنفّذ وفق أعلى معايير السلامة والأداء الهندسي.

لماذا تتصدر مشاريع الهياكل الفولاذية مشهد البناء؟

توفر الهياكل الفولاذية قوة إنشائية استثنائية، مع تقليص زمن التنفيذ وخفض تكاليف الصيانة على المدى الطويل. كما تتيح طبيعتها المعيارية مرونة عالية في التوسعة والتعديل، وهو ما يجعلها الحل الأمثل للقطاعات الصناعية سريعة التطور.
ومنذ الفكرة الأولى وحتى التسليم النهائي، نتولى إدارة جميع مراحل المشروع بدقة عالية تشمل التصميم الإنشائي، التصنيع، التركيب، وأعمال التشطيب، لنقدّم منشآت لا تلبّي المتطلبات الفنية فحسب، بل تحقق انسجامًا معماريًا واعتمادية طويلة الأمد.

مشاريعنا حول المملكة

على مدار السنوات، أنجزنا العديد من مشاريع الهياكل الفولاذية في أبرز المدن الصناعية بالمملكة، بما في ذلك الرياض، جدة، حائل، المدينة المنورة، الدمام، وأبها.
ومن أبرز هذه المشاريع:

تعكس هذه المشاريع قدرة شركتنا على تنفيذ حلول إنشائية كبيرة الحجم تجمع بين الصلابة الإنشائية، والكفاءة التشغيلية، وسرعة الإنجاز.

← اكتشف المزيد من مشاريعنا المنفذة.

steel structure projects smsa express by aka contracting

حلول الهياكل الفولاذية لمختلف القطاعات

سواء كانت منشآت صناعية، أو مراكز لوجستية، تضمن خبرتنا أن يعمل كل هيكل بكفاءة عالية تحت مختلف ظروف التشغيل. نحن ندمج الهندسة المتقدمة، وأنظمة الأعمال الميكانيكية والكهربائية والسباكة، والتشطيبات المعمارية ضمن إطار واحد متكامل، بما يوفّر الوقت، ويقلل المخاطر، ويرفع القيمة لعملائنا.

شريكك الموثوق في مشاريع الهياكل الفولاذية بالمملكة

بسجل حافل من الإنجازات، نواصل وضع معايير جديدة في تنفيذ مشاريع الهياكل الفولاذية داخل المملكة العربية السعودية.
إذا كنت تخطط لإنشاء منشأتك الصناعية أو التجارية القادمة، يسعدنا أن نكون شريكك في تحويل رؤيتك إلى واقع متين ومتكامل.
تواصل معنا اليوم.

The post Steel Structure Projects by AKA Contracting appeared first on AKA Contracting.

]]>
https://aka-contracting.com/ar/steel-structure-projects-by-aka-contracting/feed/ 0
We are going digital by implementing Odoo’s ERP system https://aka-contracting.com/ar/we-are-going-digital/ https://aka-contracting.com/ar/we-are-going-digital/#respond Mon, 08 Dec 2025 10:54:50 +0000 https://aka-contracting.com/?p=10065 AKA Contracting takes a major step in its digital transformation by adopting Odoo ERP, unifying all operations under one smart, integrated platform.

The post We are going digital by implementing Odoo’s ERP system appeared first on AKA Contracting.

]]>

ننتقل إلى مستوى جديد من الكفاءة

في AKA Contracting، نواصل الاستثمار في تطوير عملياتنا وتعزيز كفاءتنا التشغيلية، وذلك عبر إطلاق مرحلة جديدة من التحوّل الرقمي داخل الشركة.
يسعدنا الإعلان عن اعتمادنا النظام العالمي Odoo ليكون منصة إدارة الموارد المؤسسية (ERP) الشاملة لجميع عمليات AKA Contracting — من إدارة المشاريع والمشتريات، إلى الموارد البشرية والمحاسبة، وإدارة المستودعات وسلاسل الإمداد.

هذه الخطوة ليست مجرد تحديث تقني، بل نقلة استراتيجية تضمن:
- دقة أعلى في البيانات
- تسريع اتخاذ القرارات
- تحسين إدارة المشاريع في جميع مراحلها
- رفع مستوى الجودة والشفافية
- توحيد العمليات داخل نظام واحد متكامل

نحو منظومة تشغيل أكثر ذكاءً… وأكثر جاهزية لمشاريع الغد.

The post We are going digital by implementing Odoo’s ERP system appeared first on AKA Contracting.

]]>
https://aka-contracting.com/ar/we-are-going-digital/feed/ 0
Progress Continues at Frozen Cold Storage Facility https://aka-contracting.com/ar/progress-continues-at-mujammad-warehouse-project/ https://aka-contracting.com/ar/progress-continues-at-mujammad-warehouse-project/#respond Mon, 08 Dec 2025 10:52:13 +0000 https://aka-contracting.com/?p=10057 Major structural milestones have been completed at Mujammad Warehouse Project, paving the way for steel structure installation and the next phase of development.

The post Progress Continues at Frozen Cold Storage Facility appeared first on AKA Contracting.

]]>

التقدم مستمر في مشروع ثلاجة مجمّد

تتقدّم الأعمال الميدانية في مشروع ثلاجة مجمّد بخطوات ثابتة نحو إرساء البنية الإنشائية التي يقوم عليها المبنى بالكامل.

وقد تم تنفيذ المرحلة الجديدة وفق أعلى المعايير الهندسية، إذ شملت:
– الانتهاء من صبّ الأعمدة الخرسانية وتعزيزها بالتسليح الدقيق.
– تشييد الجدران وفق مخططات التحميل المعتمدة.
– تجهيز الموقع لبدء أعمال تركيب الهيكل الفولاذي والعناصر الإنشائية اللاحقة.

يمثّل إنجاز هذه المرحلة خطوة محورية في مسار المشروع، إذ تُعدّ الأساس البنيوي الذي يضمن قوة الهيكل واستدامة الأداء على المدى الطويل.

The post Progress Continues at Frozen Cold Storage Facility appeared first on AKA Contracting.

]]>
https://aka-contracting.com/ar/progress-continues-at-mujammad-warehouse-project/feed/ 0
Fire Safety Infrastructure Now Fully Operational at Awali Al Kheir https://aka-contracting.com/ar/fire-safety-infrastructure-now-fully-operational-at-awali-al-kheir/ https://aka-contracting.com/ar/fire-safety-infrastructure-now-fully-operational-at-awali-al-kheir/#respond Mon, 08 Dec 2025 10:39:49 +0000 https://aka-contracting.com/?p=10051 Fire protection works are now fully implemented at the Awali Al Kheir cold storage facility, ensuring a fully integrated safety system built to the highest standards.

The post Fire Safety Infrastructure Now Fully Operational at Awali Al Kheir appeared first on AKA Contracting.

]]>

الانتهاء من اعمال تركيب مكافحة الحريق في ثلاجة عوالي الخير

في ثلاجة عوالي الخير اكتمل الآن تنفيذ منظومة الحماية بالكامل، وفق أعلى معايير السلامة المعتمدة للمنشآت الحساسة.

يشمل ذلك تركيب الشبكات والمرشّات وأنظمة الإنذار، وتكاملها مع بقية الأعمال الميكانيكية لضمان استجابة فورية عند الحاجة.


The post Fire Safety Infrastructure Now Fully Operational at Awali Al Kheir appeared first on AKA Contracting.

]]>
https://aka-contracting.com/ar/fire-safety-infrastructure-now-fully-operational-at-awali-al-kheir/feed/ 0
Completion of the Steel Structure Works – Awali Al Kheir Project https://aka-contracting.com/ar/completion-of-the-steel-structure-works-awali-al-kheir-project/ https://aka-contracting.com/ar/completion-of-the-steel-structure-works-awali-al-kheir-project/#respond Mon, 08 Dec 2025 10:23:02 +0000 https://aka-contracting.com/?p=10033 The steel structure of the Awali Al Kheir project has been fully completed, marking a major milestone that sets the foundation for the next phase of interior and operational works.

The post Completion of the Steel Structure Works – Awali Al Kheir Project appeared first on AKA Contracting.

]]>

اكتمال اعمال الهيكل الفولاذي لمشروع عوالي الخير

لقد تم تنفيذ الأعمال بدقّة عالية وبالتوازي مع تجهيزات الموقع، لضمان تسلسل هندسي متكامل يختصر الوقت ويرفع من كفاءة التنفيذ.

. ومع اكتمال هذا الجزء الجوهري، تبدأ مرحلة الأعمال الداخلية ومنها أعمال الجبسن بورد، أنظمة العزل، أعمال الكهرباء والسباكة وغيرها من الأعمال التي تمنح المنشأة وظيفتها التشغيلية الكاملة.

في AKA Contracting، نؤمن أن قوة المشاريع تبدأ من قوة هياكلها… وما تحقق اليوم هو دليل جديد على التزامنا بالجودة والموثوقية في كل خطوة.

The post Completion of the Steel Structure Works – Awali Al Kheir Project appeared first on AKA Contracting.

]]>
https://aka-contracting.com/ar/completion-of-the-steel-structure-works-awali-al-kheir-project/feed/ 0
AKA Contracting Signs Strategic Agreement to Build Almarai’s New Central Laboratory in Al Kharj https://aka-contracting.com/ar/aka-contracting-signs-strategic-agreement-to-build-almarais-new-central-laboratory-in-al-kharj/ https://aka-contracting.com/ar/aka-contracting-signs-strategic-agreement-to-build-almarais-new-central-laboratory-in-al-kharj/#respond Mon, 08 Dec 2025 10:11:53 +0000 https://aka-contracting.com/?p=10022 AKA Contracting proudly announces its strategic partnership with Almarai to build the new Central Laboratory in Al Kharj—an advanced industrial project that reflects Almarai’s trust in our engineering excellence.

The post AKA Contracting Signs Strategic Agreement to Build Almarai’s New Central Laboratory in Al Kharj appeared first on AKA Contracting.

]]>

شراكة استراتيجية جديدة: توقيع عقد إنشاء مختبر مركزي جديد لشركة المراعي

بفخر نعلن عن خطوة استراتيجية جديدة في مسيرة شركة أحمد خفيان العنزي للمقاولات…

حيث وقعنا رسميًا عقد إنشاء المختبر المركزي الجديد لشركة المراعي. في محافظة الخرج – الرياض، أحد أهم المشاريع المتخصصة في البنية التحتية المخبرية والصناعية في المملكة.

يمثل هذا المشروع محطة مهمة تُجسّد ثقة المراعي في خبراتنا الهندسية وقدرتنا على تنفيذ مشاريع عالية الدقة، تجمع بين الأعمال المدنية، والهياكل الفولاذية، والأنظمة الكهربائية والميكانيكية المتقدمة، وفق أعلى المعايير العالمية للجودة والسلامة.

من خلال هذا التعاون، نواصل تعزيز حضورنا في قطاع المشاريع الصناعية المتخصصة، ونثبت مرة أخرى أن بناء الثقة يبدأ من بناء الجودة… وأن الشراكات الكبرى تُصنع على أرض الواقع، عبر إنجازات ملموسة ومشاريع متكاملة.

The post AKA Contracting Signs Strategic Agreement to Build Almarai’s New Central Laboratory in Al Kharj appeared first on AKA Contracting.

]]>
https://aka-contracting.com/ar/aka-contracting-signs-strategic-agreement-to-build-almarais-new-central-laboratory-in-al-kharj/feed/ 0
Completion of Fire Tank Wall Reinforcement – Frozen Cold Storage https://aka-contracting.com/ar/completion-of-fire-tank-wall-reinforcement-mujammad-warehouse/ https://aka-contracting.com/ar/completion-of-fire-tank-wall-reinforcement-mujammad-warehouse/#respond Mon, 01 Dec 2025 11:11:05 +0000 https://aka-contracting.com/?p=9963 We completed the reinforcement works for the fire tank walls at Mujammad Warehouse Project, ensuring structural strength and full readiness for high-pressure firefighting operations.

The post Completion of Fire Tank Wall Reinforcement – Frozen Cold Storage appeared first on AKA Contracting.

]]>

الانتهاء من أعمال حدادة جدران خزان الحريق في ثلاجة مجمّد

اكتملت أعمال حدادة جدران خزان الحريق ضمن مشروع ثلاجة مُجمّد، وهي خطوة محورية لضمان متانة الخزان وقدرته على تحمّل الضغط التشغيلي لأنظمة مكافحة الحرائق.

تم تنفيذ أعمال التسليح وفق المعايير الهندسية المعتمدة، وشملت:
– تشكيل قضبان الحديد وتثبيتها بدقة لضمان التداخل المناسب وتقوية الجدران.
– مراعاة سماكات الجدران والتسليح المطلوب لتحمّل الضغط الهيدروليكي.
– تجهيز موقع الخزان للانتقال إلى مرحلة صبّ الخرسانة الإنشائية.

يُعد خزان الحريق جزءًا أساسيًا من منظومة السلامة للمشروع، إذ يوفّر إمدادًا مستمرًا للمياه في حالات الطوارئ ويضمن استجابة فعّالة وسريعة.

The post Completion of Fire Tank Wall Reinforcement – Frozen Cold Storage appeared first on AKA Contracting.

]]>
https://aka-contracting.com/ar/completion-of-fire-tank-wall-reinforcement-mujammad-warehouse/feed/ 0