{"version":"1.0","provider_name":"<br>\u062a\u0648\u0627\u0635\u0644 \u0645\u0639 \u0641\u0631\u064a\u0642\u0646\u0627 \u0644\u0628\u062f\u0621 \u0645\u0634\u0631\u0648\u0639\u0643 \u0628\u062e\u0637\u0648\u0627\u062a \u0645\u062f\u0631\u0648\u0633\u0629 \u0648\u0646\u0647\u0627\u064a\u0629 \u0645\u0636\u0645\u0648\u0646\u0629.","provider_url":"https:\/\/aka-contracting.com\/ar","author_name":"Firas","author_url":"https:\/\/aka-contracting.com\/ar\/author\/firas\/","title":"SMSA Express Company - Logistics Warehouses - AKA Contracting","type":"rich","width":600,"height":338,"html":"<blockquote class=\"wp-embedded-content\" data-secret=\"KvQupvYA9h\"><a href=\"https:\/\/aka-contracting.com\/ar\/smsa-express-company-2\/\">SMSA Express Company &#8211; Logistics Warehouses<\/a><\/blockquote><iframe sandbox=\"allow-scripts\" security=\"restricted\" src=\"https:\/\/aka-contracting.com\/ar\/smsa-express-company-2\/embed\/#?secret=KvQupvYA9h\" width=\"600\" height=\"338\" title=\"&#8220;SMSA Express Company &#8211; Logistics Warehouses&#8221; &#8212; AKA Contracting\" data-secret=\"KvQupvYA9h\" frameborder=\"0\" marginwidth=\"0\" marginheight=\"0\" scrolling=\"no\" class=\"wp-embedded-content\"><\/iframe><script>\n\/*! This file is auto-generated *\/\n!function(d,l){\"use strict\";l.querySelector&&d.addEventListener&&\"undefined\"!=typeof URL&&(d.wp=d.wp||{},d.wp.receiveEmbedMessage||(d.wp.receiveEmbedMessage=function(e){var t=e.data;if((t||t.secret||t.message||t.value)&&!\/[^a-zA-Z0-9]\/.test(t.secret)){for(var s,r,n,a=l.querySelectorAll('iframe[data-secret=\"'+t.secret+'\"]'),o=l.querySelectorAll('blockquote[data-secret=\"'+t.secret+'\"]'),c=new RegExp(\"^https?:$\",\"i\"),i=0;i<o.length;i++)o[i].style.display=\"none\";for(i=0;i<a.length;i++)s=a[i],e.source===s.contentWindow&&(s.removeAttribute(\"style\"),\"height\"===t.message?(1e3<(r=parseInt(t.value,10))?r=1e3:~~r<200&&(r=200),s.height=r):\"link\"===t.message&&(r=new URL(s.getAttribute(\"src\")),n=new URL(t.value),c.test(n.protocol))&&n.host===r.host&&l.activeElement===s&&(d.top.location.href=t.value))}},d.addEventListener(\"message\",d.wp.receiveEmbedMessage,!1),l.addEventListener(\"DOMContentLoaded\",function(){for(var e,t,s=l.querySelectorAll(\"iframe.wp-embedded-content\"),r=0;r<s.length;r++)(t=(e=s[r]).getAttribute(\"data-secret\"))||(t=Math.random().toString(36).substring(2,12),e.src+=\"#?secret=\"+t,e.setAttribute(\"data-secret\",t)),e.contentWindow.postMessage({message:\"ready\",secret:t},\"*\")},!1)))}(window,document);\n\/\/# sourceURL=https:\/\/aka-contracting.com\/wp-includes\/js\/wp-embed.min.js\n<\/script>","thumbnail_url":"https:\/\/aka-contracting.com\/wp-content\/uploads\/2025\/06\/\u0644\u0642\u0637\u0629-\u0627\u0644\u0634\u0627\u0634\u0629-17.jpg","thumbnail_width":1920,"thumbnail_height":1080,"description":"SMSA Express Transport Company &#8211; Logistics Warehouses Location Tabuk Industrial City Duration 8 months Completion Date December 30, 2023 Built-up Area 15,000 square meters Project Type Modern Logistics Warehouse within the Steel Structures Department (Prefabricated Structures) We successfully delivered a turnkey logistics warehouse for SMSA Express in Tabuk Industrial City, a key project designed to strengthen logistics connectivity and support operations serving NEOM City. Spanning 15,000 m\u00b2, the facility integrates pre-engineered steel structures, comprehensive MEP systems, and advanced safety and monitoring solutions, including fire alarm networks, automatic sprinklers, and CCTV systems. The project also included extensive asphalt paving over 8,000 m\u00b2, modern architectural finishes, and a robust HVAC system that ensures climate stability for high-efficiency operations. Completed within schedule and recognized by Modon Authority for its excellence, this project exemplifies AKA Contracting\u2019s expertise in delivering large-scale, high-performance logistics infrastructure with precision, speed, and technical excellence. Scope of work and services provided: \u25cb Implementation of precise civil works for the project foundations \u25cb Installation of prefabricated steel structures, an essential part of the infrastructure \u25cb Extensive asphalt works covering 8,000 square meters to facilitate movement within the site \u25cb Architectural finishes that enhance the exterior and interior appearance while adhering to functional requirements. \u25cb Installation of a comprehensive sewage network and plumbing works, an integrated electrical system equipped with modern and advanced lighting \u25cb Low-current systems including fire alarm and monitoring (CCTV cameras, automatic fire sprinklers, strategically placed extinguishers) \u25cb A robust heating, ventilation, and air conditioning system regulates the indoor climate to improve operational efficiency Results and assessment: \u25cb The project was successfully delivered within the specified schedule. \u25cb Enhance SMSA&#8217;s logistics capabilities in NEOM \u25cb The project has received awards from the Modon Authority, which confirms its importance in the industrial sector. https:\/\/aka-contracting.com\/wp-content\/uploads\/2024\/06\/SMSA-EN.mp4"}