{"version":"1.0","provider_name":"<br>\u062a\u0648\u0627\u0635\u0644 \u0645\u0639 \u0641\u0631\u064a\u0642\u0646\u0627 \u0644\u0628\u062f\u0621 \u0645\u0634\u0631\u0648\u0639\u0643 \u0628\u062e\u0637\u0648\u0627\u062a \u0645\u062f\u0631\u0648\u0633\u0629 \u0648\u0646\u0647\u0627\u064a\u0629 \u0645\u0636\u0645\u0648\u0646\u0629.","provider_url":"https:\/\/aka-contracting.com\/ar","author_name":"Firas","author_url":"https:\/\/aka-contracting.com\/ar\/author\/firas\/","title":"SMSA Express Company - AKA Contracting","type":"rich","width":600,"height":338,"html":"<blockquote class=\"wp-embedded-content\" data-secret=\"VxzwCbzqq5\"><a href=\"https:\/\/aka-contracting.com\/ar\/smsa-express-company-3\/\">\u0634\u0631\u0643\u0629 \u0633\u0645\u0633\u0627 \u0644\u0644\u0646\u0642\u0644 \u0627\u0644\u0633\u0631\u064a\u0639<\/a><\/blockquote><iframe sandbox=\"allow-scripts\" security=\"restricted\" src=\"https:\/\/aka-contracting.com\/ar\/smsa-express-company-3\/embed\/#?secret=VxzwCbzqq5\" width=\"600\" height=\"338\" title=\"&#8220;SMSA Express Company&#8221; &#8212; AKA Contracting\" data-secret=\"VxzwCbzqq5\" frameborder=\"0\" marginwidth=\"0\" marginheight=\"0\" scrolling=\"no\" class=\"wp-embedded-content\"><\/iframe><script>\n\/*! This file is auto-generated *\/\n!function(d,l){\"use strict\";l.querySelector&&d.addEventListener&&\"undefined\"!=typeof URL&&(d.wp=d.wp||{},d.wp.receiveEmbedMessage||(d.wp.receiveEmbedMessage=function(e){var t=e.data;if((t||t.secret||t.message||t.value)&&!\/[^a-zA-Z0-9]\/.test(t.secret)){for(var s,r,n,a=l.querySelectorAll('iframe[data-secret=\"'+t.secret+'\"]'),o=l.querySelectorAll('blockquote[data-secret=\"'+t.secret+'\"]'),c=new RegExp(\"^https?:$\",\"i\"),i=0;i<o.length;i++)o[i].style.display=\"none\";for(i=0;i<a.length;i++)s=a[i],e.source===s.contentWindow&&(s.removeAttribute(\"style\"),\"height\"===t.message?(1e3<(r=parseInt(t.value,10))?r=1e3:~~r<200&&(r=200),s.height=r):\"link\"===t.message&&(r=new URL(s.getAttribute(\"src\")),n=new URL(t.value),c.test(n.protocol))&&n.host===r.host&&l.activeElement===s&&(d.top.location.href=t.value))}},d.addEventListener(\"message\",d.wp.receiveEmbedMessage,!1),l.addEventListener(\"DOMContentLoaded\",function(){for(var e,t,s=l.querySelectorAll(\"iframe.wp-embedded-content\"),r=0;r<s.length;r++)(t=(e=s[r]).getAttribute(\"data-secret\"))||(t=Math.random().toString(36).substring(2,12),e.src+=\"#?secret=\"+t,e.setAttribute(\"data-secret\",t)),e.contentWindow.postMessage({message:\"ready\",secret:t},\"*\")},!1)))}(window,document);\n\/\/# sourceURL=https:\/\/aka-contracting.com\/wp-includes\/js\/wp-embed.min.js\n<\/script>","thumbnail_url":"https:\/\/aka-contracting.com\/wp-content\/uploads\/2025\/06\/\u0644\u0642\u0637\u0629-\u0627\u0644\u0634\u0627\u0634\u0629-17.jpg","thumbnail_width":1920,"thumbnail_height":1080,"description":"SMSA Express Transport Company &#8211; Logistics Warehouses Location Hail and Medina Duration 6 months Completion Date July 2016 Built-up Area 1,900 square meters (1,200 square meters logistics warehouse + 500 square meters concrete administrative building distributed over the two sites) Project Type Logistics Warehouses within the Steel Structures Department (Prefabricated Structures) We executed two turnkey logistics warehouse projects for SMSA Express in the cities of Hail and Medina, in collaboration with Al-Ammar Office \u2013 Engineer Abdul Razzaq Hakim. The development included the construction of pre-engineered steel structures, along with complete civil, architectural, electrical, and mechanical works, ensuring seamless functionality and operational efficiency across both sites. Delivered on schedule and to the highest technical standards, these facilities strengthened SMSA\u2019s logistics infrastructure and enhanced its regional distribution capabilities. This project reflects AKA Contracting\u2019s proven expertise in executing multi-site industrial and logistics projects with precision, quality, and reliability. Scope of work and services provided: \u25cb Implementation of comprehensive civil works according to the highest standards \u25cb Installation of prefabricated steel structures with precision and high quality \u25cb Implementation of interior and exterior architectural finishes \u25cb Execution of electrical and mechanical works with high efficiency Results and assessment: \u25cb Strengthening SMSA&#8217;s logistics infrastructure in the two regions \u25cb Successfully deliver the project within the specified schedule. \u25cb Design of warehouses and administrative facilities that meet technical and functional requirements. \u25cb The project reflects the competence of AKA Contracting Company in implementing advanced, multi-site steel projects."}