Bahri Logistics Company - Cold Storage Facility
Location
Jeddah
Duration
3 months
Completion Date
December, 2024
Built-up Area
15,000 m2
Project Type
Fit Out
We transformed a 15,000 m² dry warehouse in Jeddah into a fully climate-controlled storage facility tailored for sensitive goods.
The project featured the supply and installation of 22 high-capacity packaged HVAC units to ensure precise temperature control. Custom steel platforms were fabricated and erected to support the heavy HVAC systems. A fiber ducting system was installed to guarantee efficient and balanced air distribution throughout the facility.
To complete the transformation, we executed all electrical works required for seamless integration and reliable operation of the systems.
Scope of work and services provided:
- ○ Design and conversion of a 15,000 m² dry warehouse into a temperature-controlled facility
- ○ Supply and installation of 22 x 30-ton packaged HVAC units
- ○ Fabrication and erection of structural steel platforms to support HVAC units
- ○ Installation of fiber ducting system to ensure efficient air distribution
- ○ Execution of complete electrical works for system integration and operation
Results and assessment:
- ○ Successful transformation of a large-scale dry store into a fully climate-controlled warehouse
- ○ Enhanced storage conditions meeting industrial cooling and operational standards
- ○ Delivery of a high-efficiency HVAC system within a complex retrofit environment
- ○ A benchmark project highlighting AKA Contracting Company's expertise in industrial HVAC and infrastructure upgrades