Completion of Fire Tank Wall Reinforcement - Frozen Cold Storage

We have completed the reinforcement works for the fire tank walls of Frozen Cold Storage Project, a key milestone in securing the tank’s structural integrity and ensuring its ability to withstand the operational pressure of firefighting systems.

The rebar works were executed with precision, including the shaping and installation of steel bars to achieve proper overlap, the application of the required reinforcement density to support high hydraulic loads, and the full preparation of the structure for the upcoming concrete casting phase.

As an essential component of the project’s safety infrastructure, the fire tank ensures a continuous and reliable water supply during emergencies, reinforcing the overall efficiency and readiness of the facility’s fire protection system.